Extra! Extra!

When my e-friend Bridget – a regular commenter here – mentioned on her blog that she had an article in the Winter Issue of Interweave Knits I was gutted. Yes, gutted. Why? because my subscription was up so I’d have to employ devious means to get to read her article.  

Or so I thought…  

When I arrived home yesterday, I was greeted by a pleasant surprise: Winter 09 is my last issue. And they’re none-too-subtle about pointing it out to me! “FINAL NOTICE” !!!!! You’d swear I’d forgotten to pay the gas bill and they were threatening to cut me off!  

Read All About It!!!

 

After I recovered from my bemusement, I remembered that I had got my issue of IK Winter 07 from a member of the Irish Knitters Board, Gilraen, on Ravelry in exchange for my copy of Mason-Dixon Knitting. So, hurrah for me and for IK’s original delay in starting my subscription – every cloud has a silver lining; it takes two years to realise some of them.  

The first thing I did – after ripping off the plastic wrapping – was to read Bridget’s Article. It was a great story about her trials and tribulations as she slogged her way through a year of knitting ten pairs of socks to give as gifts the following Christmas.  

It made me realise that I still haven’t given you all a full accounting of myself after I embarked on my own Year of Socks: my naive promise – in Christmas 07 – to knit DH a pair of socks each month for the following year.  

I say “naive”. Clearly, I mean “plain-dumb”. When I made the promise I had knit exactly one sock. NOT pair, One! I made the promise as a spur-of-the-moment decision because the present I had *planned* on giving him was this self-same PAIR of socks. Of which I had half. And I had ONLY half a pair because that first sock had taken a twice as long as I’d expected. Not to mention, the foot was an inch longer than it needed to be.  

This should have been a warning sign. Alarm bells should have been ringing in my head. In hindsight, there probably were alarm bells but I’d assumed it was Tinnitus brought on by the stress of knitting this sock.  

To keep me motivated I also joined the Sock-A-Month KAL. So, I may I present my Calender of Socks 2008:  

Click on image for Rav-link to project

January: Sock-A-Month KAL = 1/1

 

January: Socks for DH = 0/1

 

Click for Rav-link to project

February: Sock-A-Month KAL = 2/2

 

Click for Rav-link to project

February: Socks for DH = 0/2

 

Click on the image for Rav-link to project

April: Socks for DH = 2/4; SAM5KAL = 4/4

 

Click on image for Rav-link to Project

March: Socks for DH = 1/3; SAM5KAL = 3/3

 

Click on image for Rav-link to project

July: Socks for DH = 4 out of 7

 

Click on image for Rav-link

May: Socks for DH = 3/5; SAM5KAL = 5/5

 

Click on image for Rav-link

September: Socks for DH = 6/9; SAM5KAL = 8/9

 

August: Socks for DH = 5; SAM5KAL = 7

 

Click on image for Rav-link

November: Socks for DH = 7; SAM5KAL = 10

 

Click on image for Rav-link

October: Socks for DH = 7/10; SAM5KAL = 9/10

 

January: I started the year by trying to finish the Christmas-Present-Socks. Unfortunately, I decided to knit the second sock on metal circulars; whereas the first was knit on Bamboo DPNs. When I realised the socks were cursed (I was getting a pair of Little’n’Large) I abandoned them and opted instead to knit a pair of kid’s socks so that I’d at least get a credit on the Sock-A-Month 5 KAL. It wouldn’t do to just knit a pair of plain – oh no! I had to design them, based on EZ’s Fishtrap Aran. My Cheer-Me-Up Socks – which were intended for my DD, but which ended up only fitting her younger brother – were finished on the last day of January.
January’s score: DH – 0; SAM5KAL – 1 

February: Started “Hidden Passion Socks“, from Favourite Socks, for DH thinking I’d get them done in time for Valentine’s Day – bleuch! Realised after I’d turned the heel of the first sock (some time in mid-Feb!) that I should have been working in stripes or I’d run out of one colour.  These got frogged while I quickly double-knit two tubes and stuck “after-thought heels” in on the last day of February in order to qualify for a credit in SAM5. Thank Goodness it was a Leap Year that year!
February’s score: DH – 0; SAM5KAL – 2 

March: I started the Hidden Passion Socks again but this time I re-wrote the pattern so that I could make them toe-up and two-at-a-time. What’s more… I finished them! And I started another pair, “Diagonal Cross-Rib” from Favourite Socks, in anticipation of April – I was wisening up. March’s score: DH – 1; SAM5KAL – 3 

April: Abandoned the Diagonal Cross-Rib socks in mid-April when I realised that the stitch-pattern was taking too much time. Cast-on “Back-to-Basics” instead. And finished them within the month! April’s score: DH – 2; SAM5KAL – 4 

May: My version of Undulating Rib from Favourite Socks were toe-up; whereas the pattern is written cuff-down. So I called them “Bir gNitaludnu” – that’s Undulating Rib backwards – geddit? May’s score: DH – 3; SAM5KAL – 5 

June: I got busy with knitting gifts and abandoned sock knitting this month! June’s score: Socks for DH – 3; SAM5KAL – 5 

July: Cat Bordhi’s book “New Pathways for Sock Knitters” must have arrived into my life around this time. Suddenly all my socks became a collation between patterns in Favourite Socks and one of her Sockitectures. July combined “Cable Rib” socks with her Upstream Sockitecture. Started in June, finished in July. DH – 4; SAM5KAL – 6 

August: I picked up my “April” Socks again and entered them into the Ravelympics under the event “WIPs-wrestling” And I finished them too!
August’s score: DH – 5; SAM5KAL – 7 

September: Another collation this month between Mock Cable Wave from Favourite Socks and Cat Bordhi’s Riverbed Sockitecture. Technically, my “Babbling Brook” socks were done in August but I fear I may have held off posting them on SAM5 KAL until September to make sure I got a credit that month. September’s score: DH – 6; SAM5KAL – 8 

October: I called these “Tornado Toes” because they started with a Whirlpool cast-on from Cat Bordhi’s book and the pattern is her “Spiraling Coriolis” which affected the colour-changes in the yarn to produce this gorgeous Whirlwind effect. I was thrilled with these socks – they fit DH beautifully too. October’s score: DH – 7; SAM5KAL – 9 

November: On my return from The Irish Knitter’s Weekend Away I discovered that, not only had DH been minding our three kids, he’d decided to do the laundry and had inadvertently tumble-dryed and felted his March socks. I quickly released myself from my commitment to knit him any more socks. My next pair of socks were for me – my long-awaited “Monkey” by Cookie A. I decided to make these toe-up, however, and Cat-Bordhi-ize them. I called them “Simian” because they’re not quite Monkeys – they’re … similar! November’s score: DH – 7; SAM5KAL – 10 

December: I’ve no recollection of knitting any socks in December and certainly I became disillusioned with the Sock-A-Month KAL. December’s score was zero all round.
Overall score for the year: DH got seven pairs of socks; I got one; I frogged 3 and re-knit 1. Overall: Socks completed =10. Socks started? Who knows, I lost count.
Edited to add a poll (really coz I want to figure-out how)
Vote for your Favourite pair all those I knit for DH

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: